Cabletron Systems BRIM-E6 Specifications Page 22

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 21
FULL E-1 CONFIGURATION USING PPP
WPIM-E1 LOCAL MANAGEMENT GUIDE 2-13
3. If the E1 Line Coding is HDB3 on the previous screen:
a. Use the arrow keys to highlight Line Coding. Press the
SPACEBAR to select None, then press ENTER.
b. Use the arrow keys to highlight Active Protocol. Press the
SPACEBAR to select PPP, then press ENTER.
c. Use the arrow keys to highlight PPP Type. Press the SPACEBAR
to select BNCP, then press ENTER.
4. If the E1 Line Coding is AMI on the previous screen:
a. Use the arrow keys to highlight Line Coding. Press the
SPACEBAR to select INV-HDLC, then press ENTER.
b. Use the arrow keys to highlight Active Protocol. Press the
SPACEBAR to select PPP, then press ENTER.
c. Use the arrow keys to highlight PPP Type. Press the SPACEBAR
to select BNCP, then press ENTER.
5. Use the arrow keys to highlight the SAVE command, then press
ENTER. The message “Save Done!” appears and Local Management
saves the changes to memory.
The WAN configuration is complete. It takes up to 60 seconds for the
WAN Interface to come out of standby and for communications to begin.
Upon saving this screen, the interface just configured is
assigned to an application port (PT#) in the table on the right
hand side of the screen.
NOTE
Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 39 40

Comments to this Manuals

No comments